By Southern Wisconsin Times |
May 9, 2024
Street resurfacing operations are set to commence on May 13 and continue through May 20 on several streets, including Gershwin Drive, Peach Tree Street, Bond Place, Winesap Court, Winesap Drive, Jonathan Drive, Red Apple Drive, and Crabapple Lane. Motorists are advised to reduce their speed when traversing work zones and consider alternate routes where possible. Further details regarding these projects can be obtained from the Engineering Division at (608) 755-3162.